EMP10/005 - For sale - T3

Sold!
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/8742b8cd-5743-4dbb-b1d1-6bb8af85c5c9.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/0cd3fd0c-b3a0-478e-a8a4-7e851598cf4b.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/08f93464-1f25-4e8f-a898-045138ccc710.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/82097c99-faf8-4556-bec8-6284f8d85a4c.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/b09bff40-565f-4fcd-8838-56bf17f4bbd9.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/33481f34-8c93-4b6b-8d04-4ae80f5a8b40.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/8742b8cd-5743-4dbb-b1d1-6bb8af85c5c9.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/0cd3fd0c-b3a0-478e-a8a4-7e851598cf4b.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/08f93464-1f25-4e8f-a898-045138ccc710.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/82097c99-faf8-4556-bec8-6284f8d85a4c.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/b09bff40-565f-4fcd-8838-56bf17f4bbd9.jpg
  • https://cdn.proppy.app/propertyphotos/2189/791e9869-b3cb-40e0-87a5-392fdec3b784/73064/33481f34-8c93-4b6b-8d04-4ae80f5a8b40.jpg
  • 3
  • 3
  • 232,1m2
  • 161,3m2
  • 70,8m2
Ref: EMP10/005
Sale price
445 000 €
  • 3
  • 3
  • 232,1m2
  • 161,3m2
  • 70,8m2
Ref: EMP10/005

New T3 Apartment DUPLEX in the center of Lagos

Fantastic development with excellent finishes, of modern style, with elevator and private underground parking.
The building has only 4 levels, 2 apartments per floor. It features T2 and T3 Duplex.

This flat is a Duplex, of type T3 (3 bedrooms), located on the top floor. It offers a gross area of 161.30 sq.m.
The terrace area is huge and has a total of 70.80 sq.m, great for spending good times outside while enjoying the beautiful open views over the surrounding area.

The apartment is equipped with Daikin air conditioning, central vacuum, solar heating system, electric underfloor heating in bathrooms, aluminum frames with thermal cut and double glazing, electric thermal shutters, high security armored door, video intercom system, safe and pre-installation of ambient sound system in the living room.

The open-plan kitchen over the living room comes all equipped : induction hob, extractor hood, oven, microwave, refrigerator, dishwashers and laundry.

This new development enjoys a privileged location, at the gates of the historic center, close to numerous shops and services, such as supermarkets, restaurants, schools, as well as our beautiful Marina.

Born in a very central area of Lagos, close to everything you need to live comfortably. You're going to want to live here! Do not miss this opportunity and come and visit. Contact us.

Property Features

  • Washing machine
  • Dishwashing machine
  • Air conditioning
  • Fitted wardrobes
  • Central vacuum system
  • Equipped kitchen
  • Walk-in wardrobe
  • Safe
  • Thermoaccumulator
  • Proximity: Restaurants, City, Pharmacy, Public Transport, Schools, Playground, Shopping, Beach
  • Garden
  • Terrace
  • Garage
  • Built year: 2021
  • Floors: 4
  • Drive way
  • Views: Garden view, City view, Urbanization view
  • Video entry system
  • Lift
  • Double glazing
  • Electric shutters
  • Electric garage gate
  • Walking distance to beach
  • Central location
  • Solar heating
  • Security door
  • Energetic certification: A
  • Balcony
  • Energy Certificate

Enquire

Our website uses cookies to improve your user experience. By using the website, you confirm that you accept the use of cookies in accordance with our privacy policy.   Learn More